AVR Energies delivers power plant erection, commissioning and start-up, skilled staffing and training support so thermal energy projects move from construction to reliable operation with clear ownership and accountability.
Our teams cover preparatory work, structural and equipment erection, electrical works, recommissioning after outages or upgrades, and the people and documentation needed to run the plant safely day to day.
Power Plant Erection
Power plant erection, also known as power station erection, involves preparatory work, structural erection, equipment erection and electrical erection to make a plant fully operational—including assembling components, equipment and systems, as well as starting up the plant.
01 Facility Inspection
Inspecting the facility to assess structural readiness and space availability.
02 Site Preparation
Clearing working areas and ensuring access for equipment handling.
03 O&M Protocol
Development of a systematic protocol for O & M.
04 Quality Checks
Performing quality checks for damaged or missing parts.
05 Equipment Alignment
Align the plant equipment: boiler, turbine, generator, condensers, pumps, piping and more.
06 Pre-Commissioning
Performing mechanical runs, pressure tests, electrical tests and calibration to check for leaks, vibrations and electrical faults.
07 Process Supervision
Supervise the processes with technological aid.
08 Trial Runs & Tests
Conduct trial runs and performance tests under load conditions, and document test results.
09 HSE Programs
Development of HSE (Health, Safety & Environment) programs.
10 Issue Management
Managing any challenges as and when they arise.

Power Plant Commissioning & Start-Up
Our organization has a team of professionals with extensive experience in commissioning and recommissioning power plants. Our scope includes:

01 Plant Restart
Bringing a previously operating or shut-down plant back into operation after a period of inactivity or upgrades.
02 System Testing
Electrical, mechanical, control and full system testing to ensure it meets design specifications.
03 Smooth Transition
Ensure smooth transition and initiation of the plant.
04 Performance Confirmation
Confirming whether the plant meets performance expectations, such as power output and availability.
05 Secure Start-Up
Assist in the secure start-up of machinery and equipment while ensuring regulatory compliance.
Staffing & Manpower Management
AVR Group assists thermal power plants to hire their ideal resources through:
01 Role Definition
Defining the job responsibilities for power plant staff.
02 Initial Screening
Doing the initial screening process.
03 Candidate Profile
Determining the candidate profile.
04 Hire & Contract
We do both direct hire and contract staffing for the company.

Training & Documentation
We help companies develop standard operating protocols to streamline operations. Our team works closely with the in-house team to understand their challenges and procedures, with a clear comprehension of industry expectations.

01 Assess Requirements
Access and assess training and documentation requirements.
02 Training Materials
Develop training materials tailored to plant procedures.
03 Educate Resources
Educate the resources on standard operating practices.
04 Transition Support
Assist in transition to steady-state operations.

