Power Plant Erection

Power plant erection, also known as power station erection, involves preparatory work, structural erection, equipment erection and electrical erection to make a plant fully operational—including assembling components, equipment and systems, as well as starting up the plant.

01 Facility Inspection

Inspecting the facility to assess structural readiness and space availability.

02 Site Preparation

Clearing working areas and ensuring access for equipment handling.

03 O&M Protocol

Development of a systematic protocol for O & M.

04 Quality Checks

Performing quality checks for damaged or missing parts.

05 Equipment Alignment

Align the plant equipment: boiler, turbine, generator, condensers, pumps, piping and more.

06 Pre-Commissioning

Performing mechanical runs, pressure tests, electrical tests and calibration to check for leaks, vibrations and electrical faults.

07 Process Supervision

Supervise the processes with technological aid.

08 Trial Runs & Tests

Conduct trial runs and performance tests under load conditions, and document test results.

09 HSE Programs

Development of HSE (Health, Safety & Environment) programs.

10 Issue Management

Managing any challenges as and when they arise.

Power plant erection

Power Plant Commissioning & Start-Up

Our organization has a team of professionals with extensive experience in commissioning and recommissioning power plants. Our scope includes:

Power plant commissioning and start-up

01 Plant Restart

Bringing a previously operating or shut-down plant back into operation after a period of inactivity or upgrades.

02 System Testing

Electrical, mechanical, control and full system testing to ensure it meets design specifications.

03 Smooth Transition

Ensure smooth transition and initiation of the plant.

04 Performance Confirmation

Confirming whether the plant meets performance expectations, such as power output and availability.

05 Secure Start-Up

Assist in the secure start-up of machinery and equipment while ensuring regulatory compliance.

Staffing & Manpower Management

AVR Group assists thermal power plants to hire their ideal resources through:

01 Role Definition

Defining the job responsibilities for power plant staff.

02 Initial Screening

Doing the initial screening process.

03 Candidate Profile

Determining the candidate profile.

04 Hire & Contract

We do both direct hire and contract staffing for the company.

Staffing and manpower management

Training & Documentation

We help companies develop standard operating protocols to streamline operations. Our team works closely with the in-house team to understand their challenges and procedures, with a clear comprehension of industry expectations.

Training and documentation

01 Assess Requirements

Access and assess training and documentation requirements.

02 Training Materials

Develop training materials tailored to plant procedures.

03 Educate Resources

Educate the resources on standard operating practices.

04 Transition Support

Assist in transition to steady-state operations.